Project manager for a Cable Planning Essay

  • Category: Management
  • Words: 252
  • Published: 01.08.20
  • Views: 663
Download This Paper

Because the project manager to get a Cable Planning team, Let me manage the creation with the cable policy for a new building that will be built, with development set to begin in six weeks. My first process in creating a Cabling Plan is to develop an Business Summary which will contain the Task Introduction and Infrastructure Cable connection Specifications and Standards. My own manager offered me the overall job plan that includes: A detailed description of the fresh building, including the total number of computers for all of the employees in the company. Also the machine and network topology hardware that is required to set the system with each other.

NFPA70 Nationwide Electric Code Document 645 and Article 800 2 . 2 . 15. NFPA 70E Standard for Power Safety in the Workplace, 2004 Edition 2 . installment payments on your 16. NFPA 75 Standard for the Protection details Technology Gear, 2003 Impotence.

Building Standards and Codes: ANSI/TIA/EIA-568-B. 1, ANSI/TIA/EIA-568-B. 2, ANSI/TIA/EIA-568-B.

3, and addenda Commercial Building Telecommunications Cabling Common Portion 1: Basic Requirements Commercial Building Telecoms Cabling Common Part 2: Balanced Twisted-Pair Wiring Components (December 2003) Commercial Building Telecoms Cabling Common Component 3: Optical Fiber Wiring and Pieces Standard e)We will need your five Cisco WS-C3750 G-24PS-S: twenty-four Ports catalyst switches to take care of the minimal standard of experiencing 4 ports free to each switch e)I will need 15 Cisco WS-C3750 G-24PS-S: 24 Ports catalyst switches to take care of the bare minimum standard of having 4 plug-ins free to each switch.

Need writing help?

We can write an essay on your own custom topics!