Need for Sethusamudram Project By simply Thirunavukkarasu. L MBA OVERVIEW India includes a peninsular coast of about six, 517km duration stretches in the state of Gujarat in West Coast to the state of Western world Bengal in East Coastline and it also comes with Andaman and Nicobar destinations. India provides 12 key ports including Khandla, Mumbai, JNPT, Mormugao, New Mangalore, Cochin in West Seacoast and Tuticorin, Chennai, Ennore, Visakhapatnam, Paradeep and Kolkata and also about 183 no major ports. Coast of India does not have a continuous routing channel linking the east and west coasts.

Currently the ships received from west shoreline and countries like Pakistan, Dubai and other western countries with the destination in east coast and various countries like Bangladesh, China and also the delivers of Indian navy and Coast protects have to navigate around Srilankan Coast resulting in increase of travel length, time and likewise the cost. The main reason for this is the presence of shallow region known as Adam’s bridge, located southeast of Rameshwaram which connects the Talimannar Coast of Srilanka.

A number of proposals were deemed from 1860 to 2001 to cut a ship channel called Sethusamudram Canal throughout the Rameshwaram hooking up the Gulf of mexico of Mannar with the Palk Bay. This kind of project will establish a continuous navigable route throughout the Indian seacoast within its territorial region. The project will quick the performance, benefits, impacts and drawbacks of Sethusamudram Canal and its effectiveness to the hinterlands. PROPOSALS OF SETHUSAMUDRAM CHANNEL PROJECT PROPOSALS OF SETHUSAMUDRAM CANAL JOB Sethusamudram canal is a one hundred and fifty year think of Tamil peoples since from your British colonial days.

The Sethusamudram cacera project contains a chequered record. The technical and environmental studies were done just before independence from your first proposal of Taylor in 1860 to Sir Robert Bristows proposal in 1922, nine proposals had been considered for digging the canal. After independence half a dozen committees advised for the Sethusamudram canal project via 1956 to 1998 consisting of Ramaswami Mudaliar Committee (1956), Nagendra Singh Committee (1967), Venkateeswaran Panel (1966), Lakshminarayanan Committee (1981), Pallavan Transfer Consultancy Solutions

Report (1996) and National Environmental Exploration Institute (NEERI), Nagpur (1998). The committees analysed the cost and benefits of the task and they mentioned the feasibility and viability of the channel. The government confirmed and analysed the various proposals and information of the task and finally declared the inauguration of the project. The positioning of the apretado proposed simply by NEERI and Technical Feasibility Report (TFR) state that the project is definitely feasible theoretically and gets the potential to run without any environmental hazard.

These two reports will be the one from where the current SSCP proposal pulls its capacity. Suggested Alignments by numerous committees: Year| Report Name| Suggested Positioning Route| 1860| Townshend proposal| Deepen Pampan pass| 1862| Parliamentary committee proposal| Two miles east of Pamban across Rameshwaram Island| 1863| William Dennison proposal| A single mile east of Parliamentary proposal throughout Rameshwaram Island| 1871| Stoddarts Proposal| Practically same place as Parliamentary proposal around Rameshwaram Island| 1872| Robertson proposal| 1 mile via Pamban| 884| John code proposal| Throughout Rameshwaram Island| 1903| Train engineer proposal| Across Rameshwaram Island| 1922| Robert Bristo proposal| Throughout Rameshwaram Island| 1956| Ramaswami mudaliar committee| Mainland by Mandapam island| 1967| Nagendra committee report| Across Rameshwaram Island| 1981| Lakshminarayan panel report| Around Dhanuskodi Area 1 Kilometres west of Ramar Temple| 1996| Pallavan transport agency repor| Revalidated Lakshminaryan panel report.

Fresh alignment certainly not suggested| 1996| Tuticorin dock trust report| Across Pamban island East of Ramar temple| 1998| National Environmental Research Company (NEERI)| Mid ocean passage acrossAdam’s bridge| Various Alignments of Sethusamudram Ship Channel Project: The whole coastal visitors from the east coast of thecountry for the west and vice-versa must go around Sri Lanka entailing an additionaldistance of more than 254-424 nautical miles and 21-36 hours of sailing period.

The Gulf of Mannar, an outlet to the Of india Ocean between south-eastern India and european Sri Lanka, is bounded for the north-east by island of Rameswaram, Adams Bridge and Mannar. The Gulf is all about 130-275 kilometres wide and 160 km in length. The Palk These types of on the north of Gulf of Mannar is about 64-137 km large and 137 km extended and includes many destinations of Sri Lanka. Furthermore, Adams Bridge located between India and Ceylon (veraltet) separating Palk Bay and Gulf of Mannar. It is about 30 km extended and the ocean across this kind of portion is definitely shallow which has a depth of about 3-3. meters only during high tides. Various committees that have noticed that a short route through the Palk These types of is an important need to save as well as foreign exchange spent on import of fuel pertaining to Indian ships, also the nation can stand to gain earnings in money due to fee collections by International boats. THE DREAM PROJECT ACTUALLY THE JOB Sethusamudram Send Channel Project envisages dredging of a deliver channel through the Palk straits between India and Ceylon (veraltet).

The project will allow ships sailing between the east and west costs of India to have a directly passage through Indias comarcal waters, instead of having to prevent Sri Lanka. This will lead to a saving as high as 424 nm (780 Km) and up to 30 hours in cruising time. Two channels will be created by dredging to get the total of 20 km: * Adam’s Bridge portion which is of 35km, * The Bay of Bengal (BOB) component which is of length 54. 2 kilometers, * Aside from these two legs it also could have one more lower leg in the Palk Bay of length 79 km wherever dredging is definitely not required (as this area has a depth of 12 m).

The channel is from Tuticorin harbor, extend north-east up to south of Pamban Island, slice through Adams Bridge and proceeds parallel to inside line of angling between Sri Lanka and India before joining the Bay of Bengal channel. The width of channel will vary between 2 hundred and five-hundred m and may require dredging to arrive at preferred depth inside the Adams Link and Palk Bay region. The area engulfing the Adam’s Bridge generally known as ‘Sethusamudram’ continues to be derived from the Kings of Jaffna who had been called because protectors of Adams Bridge and the The southern part of sea that surrounds the location.

The Conjunction of the Proposed Channel: The proposed channel on commissioning is thought to bring plenty of prosperity and industrial development in the American indian hinterland lying down along the recommended ship channel and it is contended that the incredibly presence from the short way would increase the turn-arounds with the coastal and international vessels. SALIENT TOP FEATURES OF THE CACERA THE PROMINENT FEATURES OF THE SSCP Desk 1 Information on the project| Item| Detail| Remarks| Length| 167 Km| | Width| 300 M| Two method channel| Interesting depth of canal| 12 M| For delivers drawing up to9. 5 Meters -10 M. Capacity of ships that may use the canal| 30, 500 DWT| Naviero experts experience 23, 500 DWT can be more genuine. | Estimated cost of project| Rs a couple of, 233 crores| Escalation of cost probably. | Critique agency for project| Tutcorin Port Trust| | Project authority| Sethusamudram Corporation Ltd (SCL)| Headquarters Chennai. | Authorised capital of project| Rs 80 crores| 1 . Debt: Value “1: 1 . 52. Participants: The Shipping Corporation of India (SCI), Tuticorin Dock Trust (TPT), Dredger Organization of India (DCI) etc . | Maintenance| SCL| Needs regular dredging to keep it suit for visitors. Advantages of the project| 1 ) It provides a direct route involving the east and west coasts of India. 2 . Decreases ships sailing time by 24 to 36 hours and the length by four hundred nautical miles to Tuticorin within the East Seacoast. 3. Support economic progress 3 coastal districts. Give employment opportunities& help allied industrial creation. 4. Help development of 12-15 minor slots (13 in Tamil Nadu)| 1 . Eliminates going round Sri Lanka as at present. 2 . Requires pilotage during going through cacera. Thus acceleration will be decreased increasing sailing time. three or more.

Provides option of fishing argument in both equally Palk Gulf and Gulf of Mannar to fishermen on both side. Better marketing choices for them. four. These have never come up. Nevertheless , fishing slots will help fishermen. | Ecological & environmental watch| Distinct agencies to monitor environment and marine creatures. | | PROGRESS and design OF THE PROJECT PROGRESS OF THE TASK For contractual purposes the complete dredging function of the cacera has been split up into four parts. Details of civil works from the project and progress made so far receive in the pursuing table: Information on civil operate of the project|

A- Dredging of the canal| Detail| Location| Length| Dredging quantity| Contractor| Section A| Adam’s Bridge| 11 Km| 22. 74mn CuM| | Section B| Adam’s Bridge| 24. 05 Km| twenty-five. 31mn CuM| | Section C| Palk Strait| 40. 68 Km| 20. 95mn CuM| | Section D| Palk Strait| 13. a few Km| 13. 55mn CuM*| Dredging Corpn India Ltd (DCI)| Improvement of dredging operations so far| Palk Strait (Section D)| -| -| DCI has accomplished up to Feb 2, 06\, dredging of 2. 47mn Sperm (24. 14%) of the section| | | | | | | | | | | | THE DESIGN FOR THE SSCP PRELIMINARY DESIGN

FOR THE CHANNEL, STABILITY OF THE DREDGED SEDIMENT & THE ADDITIONAL STRUCTURES WIND FLOW, WAVE, TIDE AND CURRENT WAVE PRESSURE ANALYSIS POSITION & WAY CRITICAL SAY LOAD CONDITIONS: 1 . OPTIMUM OPERATION LOADS+ EXTREME ENVIRONMENTAL LOADS installment payments on your MINIMUM FUNCTIONAL LOADS + EXTREME ENVIRONMENTAL LOADS REGIMEN SEDIMENT INSERT & MOVEMENTS MODIFICATIONS EARTHQUAKE SPECTRA, VOLCANISM, TSUNAMI WIND SPEED EXCEEDENCE DATA SCHEDULE SEDIMENT FILL & MOVEMENT DREDGED SEDIMENT/DUMP LOAD & MOVEMENT PROBABILISTIC STABILITY ANALYSIS DREDGED SEDIMENT/DUMP

LOAD & MOVEMENT TREND HEIGHT SPECTRA, STORM SURGE, RAIN, TON MODIFICATIONS? LAST DESIGN PERTAINING TO THE CHANNEL, DREDGE STEADINESS & AUXILLARY STRUCTURES MONETARY EXPECTATIONS ECONOMIC EXPECTATIONS The whole estimated expense of the Sethusamudram canal job is Rs. 2, 233 Crores. The cost includes: T. No| Information Works| Amount(Rs. in Crores)| 1| Preliminary Expenses| 100| 2| Management costs| 5| 3| Dredging| 1719. 6| 4| Navigational Aids| twelve. 9| 5| Supply of tugs and crafts| 157. 6| 6| VTMS and equipments| 65. 9| 7| Civil works| 144| | Consultancy and supervision| 20| 9| Contingency| 100| The project will be a profit-earner and that it’ll have a cumulative surplus of Rs. several, 138 crores, 25 years following it is exposed to targeted traffic. About two, 000 ships a year (six to seven a day) will use the canal and they will totally save Rs. 107 crores in fuel. Enough time saved will be different between 25 hours and 40 hours, depending on the way to obtain the send. The time kept will be 25 hours in the event the ships layer at 12 knots an hour or so and the typical saving in distance will be 300 nm.

Based on Net Present Worth (NPV) approach, Internal Level of Return would be 10% to 17% on the project amount looking at an interest rate of 9% per annum on the capital. The surplus will be generated following your 17 numerous years of operation from the canal and it was believed to be 1600 crores and 3000 crores in its 30th year of operation. They may have given a mean value of around 2, 858 ships intended to use the apretado in the initial year of operation and by the year 2025, they expect it to go to in excess of 5, 883 ships. EXPENSE BENEFIT EXAMINATION: The studies and studies pointed out that the canal will certainly handle the traffic of 5000 delivers in the year 2025.

The poem of send should be 12m. So it is very clear that the mother vessels could hardly able to travel through the canal. For example consider 1, 500 ships using the Sethusamudram channel in first year of operation, Rs 204 crore is taken as an annual repayment, per deliver cost computes to Rs 19 lakhs pilotage fee to obtain a breakeven point. The ships consume 1 metric tonne of fuel per hour, which costs Rs twenty-four, 000. To get the Sethusamudram canal, you will need to add the pilotage price too. Essentially, if a dispatch goes through the canal, a shipping company loses Rs 19 lakh per voyage.

It is more cost effective to circumnavigate Sri Lanka from the point of view of the shipping and delivery industry. Therefore , there is absolutely no benefit to the ships and the delivery industry. ENVIRONMENTAL IMPACTS OF SSCP ENVIRONMENTAL IMPACTS OF SSCP IMPACTS OF DREDGING-ECOLOGICAL IMBALANCE: The dredging is usually estimated to be 2 , 000, 000 cubic metres in the 1st year reducing to 1. 5 million in 5 years and remaining will be regular thereafter. Regarding 8 million cubic metres is recommended to be used for degraded areas in pamban island, it is proposed to be dumped overseas in Bay of

Bengal at about 25 to 30m depth. The dredged material from Adam’s bridge location is suggested to be left offshore in to the sea in the Gulf of mannar by location which is assessed to become 25-30km faraway from Adam’s connect. The SCL Claims which the locations of dredged materials had been recognized after scientific modelling and studies so that turbidity made by dropping is confined to sea bed levels and dumped materials will not get into the funnel area. Although Environmentalists dread that there are two ways in which the plying of boats could risk the ecology.

Dredged spoil dumped in the vicinity of the islands may cause mass turbidity and suspended sedimentation. The canal might cause a difference in the value and direction of power in the Gulf of mexico of Mannar because it will be 300 metre distances wide, plus the changed currents will circulation towards the twenty one islands. The Gulf of mannar and Palk these types of provides refuge to numerous plants and creatures some of them very rare to find, which can be undisturbed simply by ship targeted traffic due to its short water. The region provides livelihood to the lakhs of angler families in 140 seaside villages in Ramanathapuram and Tuticorin zones of Tamil Nadu.

The coral reefs are the chair of natural diversity. Ocean grass meadows and seaweeds form an ecosystem which usually supports a variety of commercially crucial fish. These types of fauna and flora can be useful for controlling the coastal erosion. Environmentally friendly Impacts Assessment has failed to evaluate the effects of dredging in the sea species. Any kind of damage to the reduced trophic level would echo into bigger trophic which include fish. Higher silt insert in seawater prevents transmission of sun rays in normal water body and ultimately affect primary output.

Dredging causes disturbance to benthic creatures and fish due hanging sediments, which in turn causes disruption of migration of fish. Situations created through the dredging businesses will probably cause: 5. Smothering of benthic pets and plant life due to resettlement of suspended sediments * Disturbance of marine animals from the potential variations inside the concentration mixed oxygen 2. The Whole your life cycle with the marine pets gets effected directly or indirectly * Reduction of biologic types like coral reefs reefs and mangroves. 2. Translocation of species and removal of habitat.

METEROLOGICAL CONCERNS: Sethusamudram Canal and Navigation channels of ports of the east coast have been facing three main and persistent problems. They are: 2. Problems as a result of sedimentation, 5. Problems as a result of tropical cyclonic disturbances, * Issues associated with dumping in the dredged material. Sethusamudram The meteorologist developed that the Coastal regions of Kerala and some with the coastal areas of Tamil Nadu like Rameshwaram, Tuticorin are not affected by Tsunami because of the Adam’s bridge and dredging the bridge and disposal of dredged materials may brings about the harmful effects.

Of india Meteorological Division considers the coastal expand between Nagapattinam and Pamban as a high risk zones to the tropical cyclones. This may ends in the damage of canal and in addition risk towards the ships to pass through at the time of cyclones. RELIGIOUS CONCERNS: The Sethusamudram Canal task is also facing the religious issues. The political celebrations and other groups are quarrelling that the Adam’s bridge was built simply by Lord Ramal and they had been protested up against the project.

The federal government of India and other study centers clearly remarked that the connect was not a male made connect, but the issue becomes an important political concern nowadays. RELIABILITY ISSUES: Right now the boats of American indian Navy and coastal guards are navigating throughout the Sri Lanka to advance from west coast to east seacoast or vice versa. The job holds great for the security uses. The seaside security of Tamil Nadu gets increased and the Navy ships may able to navigate in the Of india territory water itself. The opening of canal might leads to the safety threats because of the Liberation Tigers of Tamil Eelam as like the Somalian pirates.

SPECIALIZED ISSUES: The SSCP requires the advanced cranes and other materials to dredge the bridge. But it requires barge and other materials to handle the dredged materials. The advanced disposal system should be used. There is a need for skilled labours for the successful completion of the task. SSCP-A ASSESSMENT WITH SUEZ CANAL AND PANAMA CHANNEL SSCP-A COMPARISON WITH SUEZ CANAL AND PANAMA APRETADO The Sethusamudram canal is definitely the first offshore project in the world where the Suez canal and Panama channel were the onshore assignments.

The Suez canal and panama canal are manmade canals which will reduces the navigation length and time. The features from the canals will be: Canal| Sethu Canal| Suez Canal| The country of panama Canal| Length| 89km| 192km| 80km| Location| Bay of Bengal| Connects Medittaranean Marine and Reddish Sea| Connects atlantic sea and pacific ocean| Country/Continent| India| Backlinks Asia and Europe| Links South America and North America| Toll gathered by| Job in progress simply by India| Egypt| Panama| Draught| 10. 4m| 16. 1m| 15m| Rate limit| 11-16km/hr| 8km/hr| 15km/hr|

Average flow time| 4hours| 14hours| almost eight to 10hours| Locks| No| No| 3locks| Length of the vessel| 215m| 68m above water level| 427m| Exposed to targeted traffic on| Procedure in progress| 1869| 1914| BENEFITS AS WELL AS ITS USEFULNESS TO THE HINDERLANDS BENEFITS AND ITS USEFULNESS TO THE HINTERLANDS The benefits of the Sethusamudram Cacera are: 2. There is a continuous navigation between your west coast and east coast inside the Indian area, * The navigation some the distance gets reduced, 5. Ships turn-around time boosts the revenue, Bring about substantial savings with lowering of maritime transportation cost, * The coastal security gets enhanced inside the coastal zones of Tamil Nadu, 5. Coal coming from North India to Tamil Nadu Electric power board requires sea way, * Salt, Fish, Caustic soda today using train which incures high cost may take sea path, * Household consumers will probably be benefited wit cheaper items with the lowered import costs, * Coastal movement of domestic merchandise, * Indirect and direct employment opportunities, * Leads to the infra framework development. Performance to the Hinterland: The job leads to the introduction of 15 fresh non major ports by Cuddalore, Puducherry, Karaikal, Rameshwaram. * The backward areas of Tamil Nadu Thirunelveli, Tuticorin, Ramanathapuram will gets economically produced, * Abundant resources of fish and shrimps in the area may be exported to Japan and USA through Rameshwaram port which will gets strengthened when the canal makes existence. * Chances for new industries in the regions of Rameshwaram, Thirunelveli, Cuddalore, etc ., Improvements in Tuticorin port: * Emerge as being a hub dock for container traffic 5. Enhance it is share in coastal valuables traffic Enhance its revenue by renderin service to the ships transiting through the route THE SSCP-TODAY! The Sethusamudram Corporation Limited has ceased dredging works in the Adam’s bridge due to order of Supreme The courtroom of India. The politics parties and other organisation protested against the job and they had been arguing that the Adam’s connection was constructed by Head of the family Rama. That they filed case against the project. The Substantial Court had ordered the Indian Authorities to find the substitute route intended for the canal. The Best Court experienced suggested that the alternative conjunction between Dhanushkodi and Lands End in

Rameshwaram Island become examined for producing the route. The Government of India constituted an expert panel under the chairmanship of Ur K Pachauri in September 2008 to examine the feasibility of the alternative alignment keeping in view the technical elements, cost profit analysis, socio-cultural and environmental impact and law and order things. Earlier, the project was to be created at an believed cost of Rs 2, 400 crore. But now the Ministry of Shipping is studying the cost quotes, part of which usually would be wanted for quickly to clear dues pending for the Dredging Corporation of India (DCI).

The modern estimates, which will would shortly be sent for acceptance to the Community Investment Panel, were probably be revised further more, depending on the position suggested pertaining to dredging the channel inside the Pachauri Committee report. The ambitious task was prepared to be financed on a debt-equity ratio of 1: 1 . five. CONCLUSION REALIZATION The Sethusamudram Canal has to be the monetary prosperity with the country. It really is perceived that the development of the canal might results in the prosperity in the coastal schisme of Tamil Nadu. The project improves the coastal secureness of India.

But the Sethusamudram Shipping Apretado Projects paid the way intended for issues just like environmental problems, ecological imbalance, Religious issues, security risks, and imbalanced economy of scale. The main drawback would be that the draught resistance in the apretado is twelve. 4m. The reports of National Environmental Engineering Exploration Institute (NEERI) and Environmental Impacts Evaluation reports were failed to review the ecological imbalance, cyclonic disturbances and in addition there was not any clear research and review about the positioning for disposing the dredged material. The reports did not examine the actual Environmental Plan.

There is a requirement for the concise study and survey about the project’s location as well as need. The dredging strategies and fingertips of the dredged materials should be clearly stated. The other factors like cyclonic disturbances, ocean species, turbidity, sedimentation and so forth, should be plainly analysed. The project must be economically sound and viable. When it is not feasible, the same amount should be invested in the other onshore projects which could give more quickly return in capital and development. BIBLIOGRAPHY WEBSITE LINKS: http://Sethusamudram/sethu%20m3. htmfile http://en. wikipedia. rg/wiki/Sethusamudram_Shipping_Canal_Project http://www. southasiaanalysis. org/%5Cpapers18%5Cpaper1713. html http://www. suezcanal. gov. eg/sc. aspx? show=2 http://www. pancanal. com/eng/history/index. html http://www. thehindubusinessline. com/nic/113/index. htm http://www. indiandefencereview. com/2009/02/the-sethusamudram-ship-canal-project. html http://www. nilacharal. com/news/rajan/raj176. html? domains=nilacharal. com&q=economic+impacts+of+sethusamudram+canal&sa=Search&sitesearch=YOUR+DOMAIN+NAME&client=pub-8260041701340977&forid=1&channel=6429766983 LITERATURE & INFORMATION: The location of Transportation Systems by Jean-Paul Rodrigue, Claude Comtois and Head Slack. “Souvenir The Sethusamudram Shipping channel Project simply by Tuticorin Slot trust. “Environmental Impact Evaluation for Proposed Sethusamudram Deliver Channel Project by Nationwide Environmental Engineering Research Commence, Nagpur. “Sethusamudram Shipping Apretado Project as well as the unconsidered danger factors: Should it withstand them?  by Dr . Ur. Ramesh Meters. B., M. S., Doctors for Safer Environment, Coimbatore, Tamil Nadu.